Production sequence

From raw stock to finished tool

01

Stock preparation

Raw material is cut and staged for machining, with each batch logged before it reaches the first operation.

02

Component fabrication

Machining centers shape housings, gears, and shafts to drawing, with in-line checks on critical dimensions.

03

Motor and drive integration

Motors, drives, and gear sets are fitted into machinery sub-assemblies and power-driven hand tool bodies.

04

Mechanical testing

Finished assemblies run under load on the test bench to confirm smooth operation before release.

Verification

Dimensional checks before shipment

Parts are measured against tolerance drawings, and assemblies are checked for balance before packing. Packaging follows a fixed protocol so each unit leaves the facility in the condition it was tested.